[CSUSB]>> [CNS]>> [CSE]>> [R J Botting]>> biba.php

Bibliographic Item (1.0)

Boehm02

  1. Barry Boehm
  2. Get Ready for Agile Methods, with Care
  3. IEEE Computer Magazine V35n1(Jan 2002)pp64-69
  4. =IDEA XP AGILE adaptive risk-driven plandriven CMM
  5. Presents a spectrum of processes from Hacking to Inch-pebble ironbound contract. XP is the limit of th CMM range.
  6. Agile processes must have involved clientele. Plan-driven must have stable requirements.
  7. There exist requirements that break architectures.
  8. Shows graphs of risk exposure vs amount of planning for different losses that have to be traded-off at a sweet spot.
  9. For L:loss, risk_exposure(l)::=P[L] * size(L).

Search for bibliographic items containing a matching string.


(Search uses POSIX regular expressions and ignores case)

Search for a specific bibliographic item by name.



To see the complete bibliography (1Mb+) select:[Bibliography]